Sanifos 280 Helping Preserve Waterways in a Large Civil Project
Multiple Sanifos 280 were brought in as a solution for the decommissioning of aging and deteriorating septic systems servicing properties at Lake Rotoiti, NZ. The Sanifos 280’s pump waste up to the new bio treatment systems on the top end of the properties.
St James Theatre, Wellington
Forbo’s Marmoleum collection has been used to create a stunning new patterned floor at the St James Theatre in Wellington. The project was undertaken by Shand Shelton, who has been involved in the restrengthening of the theatre since 2016, with the construction phase beginning in 2019. However, the scope for a new, replacement Marmoleum patterned floor was not introduced until October 2021, just 10 months before the theatres re-opening and at the height of material supply challenges caused by Covid-19.
Our Insightful Articles
PROJECT
1 YEAR AGO
The Chapman Tripp office space is so much more than just a commercial building. Inside and out, the structure is a pinnacle of inspiring design work. Situated in the heart of Wellington, this stunning workplace features a modern blend of private spaces and a flexible open floor plan supported by the latest technological advances.
PROJECT
1 YEAR AGO
Kerakoll would like to share their driven commitment to sustainable growth “There is no value in industrial success if there is no commitment to sustainable development.” Kerakoll has achieved excellent results, the best ever, actually – confirming and boosting all their projects.
PROJECT
2 YEARS AGO
A prestigious new Sydney residential apartment development has been fitted with Doric’s new award-winning Ventus automated ventilation system.
PROJECT
2 YEARS AGO
The new Arncliffe Youth Centre, providing a local community hub for Sydney’s southern suburbs, is now completed.
PROJECT
2 YEARS AGO
Truly an undeniable transformation from start to finish with this added gas fireplace feature to the home!
PROJECT
2 YEARS AGO
eWater specification replacing 30,000L of harsh chemicals a year at the iconic Stokehouse Restaurant
PROJECT
2 YEARS AGO
We all know that sewage, stormwater and wastewater (grey water) cannot flow uphill without being pumped! There are many situations where sewage, stormwater and wastewater can’t be drained away via conventional gravity drainage and must be transferred to a higher point, whether it be to a sewer main at street level, stormwater pipe, easement etc.
PROJECT
2 YEARS AGO
Urban + Fountains & Furniture explains the Benefits of Specifying Sustainable Products in Landscape Projects and why sustainable products are needed in the Australian construction industry.
PROJECT
2 YEARS AGO
Located in the in the new Circular Quay tower, Cora’s design team was able to work within a variety of challenging spaces to meet the client’s requirements and showcase innovative bike parking solutions - including Australia's only fully dynamic upper and lower tier bike parking system (E3DT-GP).
PROJECT
2 YEARS AGO
This exceptional house places conceptual and programmatic aspirations on equal footing with broader agendas: neighbourhood generosity, passive environmental performance, and biodiversity.
PROJECT
2 YEARS AGO
With cinematic sublimity, the Wallis Lake House is situated to command box-seat viewing to Wallis Lake on the NSW Mid-North Coast.
PROJECT
2 YEARS AGO
Educational spaces are important to design to ensure students receive the best possible environment to learn in. LeFevre High School, in Semaphore South Australia, recognised the importance of creating spaces that contribute to students’ quality of education.